DCT Old Reckit Building Make Ready Interiors · Logistics
Pattillo Construction was contracted for interior renovations of all new flooring and wall finishes within the existing office area. We also changed and upgraded all the lights to new T5’s, removed and replaced all existing floor and wall caulk, repaired and replaced all damaged dock levelers and dock doors, removed striping from large warehouse floor and removed unused items in the warehouse to be a make ready space.
The exterior renovation included removing all the severely damaged asphalt then doing Full Depth Reclamation (FDR) to 12″ of the sub base before installing new asphalt to the truck dock area and drive paths in the complex. Dock pad concrete was also replaced. We also re-caulked and repainted the exterior of the 398,000 SF building.